PROJECT WIN: Congratulations to the whole idec team for securing an additional seven (7) Design and Construct acoustic buildings for the Westconnex, Stage 2 project in Sydney for CPBDS JV. This contract adds to the four (4) we are currently building on stage 1 of Westconnex. Our scope includes engineering design, fabrication (utilising our built-up
idec have acquired NSW Government Roads & Maritime Services (RMS) prequalification as a structural steel fabricator. We add this to our existing Queensland Department of Transport and Main Roads (DTMR) prequalification. idec have experience with commuter shelters, road side guard rail/ screens and signage. We look forward to expanding our repertoire of roads infrastructure projects
idec have proudly played a part in the refurbishment of the Mater Whitty Building located in South Brisbane. The Whitty Building was originally opened in 1911 and was home to Brisbane’s first hospital. This refurbishment project aimed to restore and highlight the original building’s charm and quality. Our scope included steel detailing, fabricating and erecting
Through efficient steel design and clever acoustic cladding composition, idec have secured the design and construct contract for four (4) acoustic buildings on the WestConnex- stage 1B project for Leighton Samsung John Holland Joint Venture in Sydney. WestConnex aims to ease a forecasted increase in traffic by widening and extending the M4 and M5 and
F&M have engaged idec to design and construct their new head office facility at Parkinson Industrial Estate. The facility includes: A 1590m2 warehouse plus 286m2 of office space Clear span portal frame designed to accommodate a 5 tonne overhead crane Tilt panel walls Internal fit out including an under bench aquarium Design is underway and
idec’s Darwin team have successfully completed the construction of the Remote Radar Facility for JKC. The project was delivered on time and on budget. idec’s scope for this project included: Civil construction works Concrete footings Erection of a 30m telecommunications tower Installation of an equipment shelter Earthing of all works involving 35m deep earth rods
The ABC’s 7.30 Report reveals the Australian steel industry’s warning about the safety standards of imported steel. Local fabricators are being engaged to repair dangerous workmanship on imported product bound for bridges, road infrastructure and general construction. At idec, we continue our unrelenting commitment to local manufacturing with our workshop producing a 100% compliant product. Hayden Cooper,
idec has been contracted to design and supply two (2) buildings that will form part of camp accommodation structures for employees on a significant gold mining operation in West Africa. Local temperatures reaching as high as 45 degrees have factored heavily into how idec approached the design work. Given this extreme heat, all buildings and connecting
idec CEO, Glenn Gibson, will be taking part in the 2015 Vinnies CEO Sleepout where he will be sleeping rough on one of the coldest nights of the year to raise funds to support Australia’s homeless. On Thursday 18 June, CEO’s around the country will get a small glimpse into life on the streets. Funds