Sort By: Direction:
  • BOM Weather Radar – Taroom

    As part of the Federal Government’s $28 million weather monitoring allocation for North West Queensland, idec was en...
  • Snowy Hyrdo – Marica Shed

    idec was engaged to Design and Construct a shed over the Marica snow surge shaft as part of the ongoing construction...
  • Tallowwood Place Pedestrian Bridge

    idec undertook the design and construction of the Shelgate Street Pedestrian Bridge replacement.  The bridge, locate...
  • Shelgate Street Pedestrian Bridge

    idec undertook the design and construction of the Shelgate Street Pedestrian Bridge. The bridge is located in Cherms...
  • Go Between Bridge Upgrade

    idec was engaged by BMD on the upgrade of the Go Between Bridge. This project included the supply and installation o...
  • Westgate Benalla Precast Facility

    idec was engaged by CPB and John Holland to design, fabricate and construct three manufacturing facilities in Benall...
  • Lawnton Aquatic Centre

    The construction of the grandstand at Lawnton Aquatic Centre now provides covered seating for 1,000 people, disabili...
  • Westgate Spoil Shed

    idec was engaged by CPB and John Holland to design, fabricate and construct a 90 metre x 180metre spoil shed at the ...
  • Sydney Metro – Blues Point

    idec was contracted by the John Holland, CPB and Ghella Joint Venture to design and construct an acoustic building a...
  • Sunshine Coast University Hospital

    idec were contracted to construct three (3) link bridges at the Sunshine Coast University Hospital.   These lin...
  • Dinmore & Graceville Stations

    idec was contracted to fabricate, protective coat and install steelwork for the overpass at Dinmore and Graceville t...
  • Mater Whitty Refurbishment

    idec Solutions provided the steel work for the Mater Whitty Refurbishment project in South Brisbane.  Scope included...
  • North Quay Ferry Terminal

    idec were contracted to supply and install steelwork for North Quay Ferry Terminal including the lift shaft, plaza a...
  • Sydney Metro – Northwest Casting Yard

    The 254m long x 17m high structure was constructed to support the Sydney Metro Northwest project. The structural ste...
  • Gold Coast University Hospital

    Structural steel fabrication and erection of the Mental Health Unit. Download the project sheet here: Gold Coast Hos...
  • Ipswich Hospital

    Fabrication and erection of structural steel and stairs. Download the project sheet here: Ipswich Hospital...
  • Nudgee Spoil Shed

    idec created the spoil shed as a temporary building for the spoil from the tunnel project, positioned right next to ...