Sydney Metro – Blues Point

idec was contracted by the John Holland, CPB and Ghella Joint Venture to design and construct an acoustic building at Blues Point.

The building is used for the removal of tunneling spoil and the cutting heads & shields from the tunnel boring machines and removed upon project completion.

Download the project sheet here: Blues Point

  • CLIENT John Holland, CPB & Ghella JV
  • YEAR 2019
  • WE DID Engineering & Design Drafting, Steel Fabrication, Steel Erection & Acoustic Cladding
  • CATEGORY ,
  • TAGS