idec was recently awarded the design, detailing, fabrication and installation of the Asphalt Plant at Eastern Creek Sydney, for the Fulton Hogan.
- Engineering
- Design
- Drafting
- Fabrication(160t)
- Rigging
- Cladding
Engineering and detailing have been completed and our fabrication team is fabricating and ready to send out steel to site.