Phone: (07) 3908 9600 | Email: [email protected]

idec Solutionsidec Solutions

An industry leader in design, fabrication, and construction. We are renowned for our quality, cost effectiveness, innovative approach, and professional discipline.

(07) 3908 9600
Email: [email protected]

idec Solutions Pty. Ltd.
265 Queensport Rd N, Murarrie QLD 4172

Open in Google Maps
  • Home
  • What We Do
    • [Custom]
      • Design & Engineering
      • DetailingDetailing
      • Processing
      • Fabrication
      • Construction
      • Rigging
      • Remote Infrastructure
      • Acoustic Solutions
    • [Column]
      • [Widget Area]
  • Our Sectors
    • [Custom]
      • Aviation
      • Communications & Power
      • Defence
      • Industrial
      • Major Infrastructure
      • Local Government
      • Rail
      • Recreational & Education
      • Resources & Mining
    • [Column]
      • [Widget Area]
  • Our History
    • [Custom]
    • [Widget Area]
  • Our Values
    • [Custom]
    • [Widget Area]
  • Our Projects
  • News
  • Contact

Aidan Klatt – Welding Engineer Qualification

Aidan Klatt – Welding Engineer Qualification

by idec Solutions / Monday, 07 April 2025 / Published in News

Well done to idec’s Processing and Procurement Manager, Aidan Klatt, who has recently taken a big step in advancing his knowledge and career around structural steel and fabrication. Aidan is now qualified as an International Welding Engineer in accordance with IIW standards, further strengthening idec’s quality assurance knowledge base and welding coordination.

Aidan says, “My experience was challenging but very informative, interesting, and rewarding. I learned a wide range of information about welding, material behaviour, construction and design, and fabrication and application.”

He has been a valued team member for over 7 years and we are grateful to have his knowledge and skillset available to us.

Congratulations on this achievement!

What you can read next

idec starts construction of Penrite’s 3000m2 warehouse extension
QPAC FOYER FACADE BEAM INSTALLATION
Morningside Station – Link Bridge
BACK TO NEWS PREVIEW

Recent Posts

  • ToolooaSHS

    PROJECT COMPLETION: TOOLOOA SHS COLA

  • Buranda Station – Site Installation

  • Buranda Station – Link Bridge Segments

  • NAIDOC WEEK 2024

  • Morningside Station – Link Bridge

idec Solutions

What We Do

  • Design & Engineering
  • Detailing
  • Fabrication
  • Construction
  • Rigging
  • Remote Infrastructure
  • Acoustic Solutions

Our Sectors

  • Aviation
  • Communication & Power
  • Defence
  • Industrial
  • Major Infrastructure
  • Local Government
  • Rail
  • Recreation & Education
  • Resources & Mining

Quick Links

  • Our History
  • Our Values
  • Our Projects
  • News
  • Contact Us
  • instagram
  • linkedin
  • youtube

idec Solutions Pty Ltd

265 Queensport Rd N, Murarrie QLD 4172

Phone 07 3908 9600
Email: [email protected]

Terms and Conditions
© 2020 idec Solutions Pty Ltd | All rights reserved | QBCC Licence: 707347

TOP