Transcity TBM Building

Design, fabricate and erect structural steelwork. The 87m x 77m 30m high temporary building was created to lower the Tunnel Boring Machine sections into the start of the new tunnel constructed by Transcity JV.

Download the project sheet here: Transcity TBM